NACE / PROJECT RECORD

Rabigh Dam Water Treatment Plant

Installation of 1,650 m of fencing and associated civil works, plus refurbishment of selected buildings at Rabigh Dam Water Treatment Plant, including painting, epoxy coatings, asphalt works, paving, steelwork and cleaning water drainage channels.

NACE workers carrying out preparation and excavation at Rabigh Dam Water Treatment Plant
NACE workers carrying out preparation and excavation at Rabigh Dam Water Treatment Plant

Project facts

Location
Rabigh Dam — Rabigh
Work type
Civil works, fencing and asphalt
Client / entity
Water Authority
NACE role
Installation of 1,650 m of fencing and associated civil works
Recorded metrics & quantities
  • Recorded scope: Installation of 1,650 m of fencing and associated civil works

Project scope

Works recorded within the project.

Installation of 1,650 m of fencing and associated civil works, plus refurbishment of selected buildings at Rabigh Dam Water Treatment Plant, including painting, epoxy coatings, asphalt works, paving, steelwork and cleaning water drainage channels.

Featured works

  • Installation of 1,650 m of fencing and associated civil works
  • Refurbishment of selected station buildings and painting works
  • Application of epoxy coatings
  • Asphalt works and paving
  • Steelwork
  • Cleaning water drainage channels
Technical and operational valueAn integrated scope combining fencing, building refurbishment, facility improvements and water drainage works.

Case study: coordinated works at Rabigh Dam plant.

This project records fencing, refurbishment and facility works at Rabigh Dam Water Treatment Plant. The following summary is based on the recorded scope and available photographs.

ItemRecorded scope
Location and clientRabigh Dam Water Treatment Plant, Rabigh; Water Authority.
Measured scope1,650 metres of fencing with associated civil work.
Rehabilitation scopeSelected building renewal, paint and epoxy, asphalt and paving, steelwork, and drainage-channel cleaning.

Requirements apparent from the project scope

The scope combines a long fence line, existing buildings, floors, roads and drainage channels. This indicates a need to coordinate civil works, finishes and facilities; it is an interpretation of the available scope, not a report of documented obstacles or operational outages.

Work recorded within the delivery scope

Recorded work includes fencing and associated civil works, building renewal, paint and epoxy, asphalt and paving, steelwork and channel cleaning. Photographs show site details and the fence-post line beside a drainage channel.

NACE / SITE RECORD

Project images & records

NACE workers carrying out preparation and excavation at Rabigh Dam Water Treatment Plant
From a NACE project

Documented project recordNACE / PROJECT

Protective fence alongside the access road at Rabigh dam water treatment plant
From a NACE project

Protective fence alongside the access road at Rabigh dam water treatment plant

Chain-link fence beside a rock face at the Rabigh dam site
From a NACE project

Chain-link fence beside a rock face at the Rabigh dam site

Fence works alongside the pavement at Rabigh dam water treatment plant
From a NACE project

Fence works alongside the pavement at Rabigh dam water treatment plant

Fence posts beside a drainage channel at the Rabigh Dam plant site
From a NACE project

Fence posts alongside the drainage channel at Rabigh Dam Water Treatment PlantRequest similar work ↗

Mesh fence frame detail from the Rabigh project photographs
From a NACE project

Mesh fence frame detail from the Rabigh project photographs

Fence posts and concrete base work during installation — Rabigh project photographs
From a NACE project

Fence posts and concrete base work during installation — Rabigh project photographs

Installed chain-link fencing from the Rabigh project photographs
From a NACE project

Installed chain-link fencing from the Rabigh project photographs

Services related to this scope

NACE / RELATED WORK

Related project scopes

Planning a similar scope?

Request a similar project